I recently found a 2012 essay by Steven Thomas reviewing Jeff Patton's 2007 Mona Lisa analogy. This in turn got me thinking about iteration specifically.
A lot of the early reports of Extreme Programming came out of Chrysler Comprehensive Compensation, and there's a very interesting remark in the post mortem
Subsequent launches of additional pay populations were wanted by top management within a year.To me, that sounds like shorthand for the idea that the same (very broad) use case was to be extended to cover a larger and more interesting range of inputs with only minor changes to the behaviors already delivered.
The tests that we leave behind serve to describe the constraints necessary to harvest the low hanging fruit, as best we understood them at the time, to identify regressions when the next layer of complexity was introduced to the mix.
We're writing more living documentation because we are expecting to come back to this code next year, or next month, or next sprint.
I envision something like a ten case switch statement -- we'll implement the first two cases now, to cover perhaps a third of the traffic, and then defer the rest of the work until "later", defined as far enough away that the context has been evicted from our short term memory.
If the requirements for the behaviors that you implemented in the first increment are not stable, then there is non trivial risk that you'll need several iterations to get those requirements right. Decisions change, and the implications of those changes are going to ripple to the nearest bulkhead, in which case we may need a finer grain testing strategy than we would if the requirements were stable.
At the other extreme, I'm working an an old legacy code base; this code base has a lot of corners that are "done" -- modules that haven't changed in many years. Are we still profiting by running those tests?
This is something we should keep in mind as we kata. If we want to be preparing for increments with significant time intervals between them, then we need bigger input spaces with stable requirements.
A number of the kata are decent on the stable requirements bit -- Roman numerals haven't changed in a long time -- but tend to be too small to justify not solving the whole thing in one go. Having done that, you can thank your tests and let them go.
The best of the kata I'm familiar with for this approach would be the Gilded Rose - we have a potentially unlimited catalog of pricing rules for items, so we'll incrementally adapt the pricing logic until the entire product catalog is covered.
But - to do that without breaking tests, we need stable pricing rules, and we need to know in advance which products follow which rules. If we were to naively assume, for example, that Sulfuras is a normal item, and we used it as part of our early test suite, then the updated behavior would break those tests. (Not an expensive break, in this case -- we'd likely be able to replace Sulfuras with some other normal item, and get on with it).
Expressing the same idea somewhat differently: in an iterative approach, we might assume that Sulfuras is priced normally, and then make adjustments to the tests until they finally describe the right pricing constraints; in an incremental approach, Sulfuras would be out of scope until we were ready to address it.
I think the scheduling of refactoring gets interesting in an incremental approach - how much refactoring do you do now, when it is still uncertain which increment of work you will address next? Is Shameless Green the right conclusion for a design sessions?
The Sudoku problem is one that is one that I struggle to classify. One the one hand, the I/O is simple, and the requirements are stable, so it ought to hit the sweet spot for TDD. You can readily imagine partitioning the space of sudoku problems into trivial, easy, medium, hard, diabolical sets, and working on one grouping at a time, and delivering each increment in turn.
On the other hand, Dr Norvig showed that, if you understand the problem, you can simply draw the rest of the fucking owl. The boundaries between the categories are not inherent to the problem space.